.
My legs do hurt. From stooping, bending, walk, lifting. Muscles. But no worries. I'll keep at things. I am pretty sure I am nearing the end though, for a while. Or of the more intense work efforts. I am hoping to get the wood pile sorted, the branches and twigs managed, and most of the garden hoses picked up, checked, and either disposed or stored. All of it? Most of it? Wood pile is priority.
It was 67, I think, last time I checked, about an half hour ago. The clouds are slowing the warming. Checked the towels, not quite dry. I'll keep checking them. Closer. As it warmed they sure got better, again. Almost dry last night, just didn't get there. Then night humidity, dew, crept in.
A fatted coffee and a few meat sticks. Breakfast will be light.
A bit of browsing, then gaming, to wake. I am trying a new part of the game, specially formulated master sections, redone, made much more difficult. I'm... going to do a bit of reading on those. Not sure they are practical for pleasure players. More for the fan-boy zeroheads? Dunno. Will look. Then again, the game seemed difficult to start. And, at some levels of difficulty, are difficult.
Just trying to wake up, to get out and begin on the pile. The big one first. The branches, if need be, can just be put in the outbuilding, and dealt with there, as desired. Oh, and I'd like to get the fencing down and stored. Those three things, before my legs totally give out, it is hoped.
Then I can do things in here, seated. Work on tearing down boxes, sort through boxes, even light clearing of this room if I will have to walk. I won't have to stoop too much. And can go at a slower pace. And, clearing and cleaning upstairs, too, can be done mostly while seated. Then again, the legs won't probably go totally. Just... become a little less dependable, and won't want to be on them for hours, or even too many minutes at a time.
One more day of work, after this. And, only one major project Friday... cleaning the stove and oven. Cleaning it deeply, well, even pulling it and cleaning the sides. Maybe under it. A complete, inside and out, scrubbing, and of the floor used for it's base. Yea. That is Friday. Until then, those things on my list, inside and out. Two more days of more intense work, a day of focused work, and light work on the weekend.
With dishes and else being kept up, I can do light bathroom straightening and cleaning, and the kitchen getting a bit more organized, on the weekends. But... light, slow, easy paced work. Not killing it. Just... doing it. While I can, I will. It's like something was unlocked. The cage bars were flung open, and I could initially crawl, then sprint, out.
Well, on to the wood pile. After I finish my coffee. Later.
No comments:
Post a Comment
Backsass Here