.
I finally woke up at 15:08. I went done at eight or slighty after. Was, and wasn't, trying to stretch my day, to push on through. It almost more happened, if it was on my mind to do so. I just did what I did, without much actual input? Yes. I didn't have a whole lot of choice, not matter what I thought. And I was split in my thinking on the matter anyway. So... yes and no?
It seems to have continued raining. Off and on, though, too. Sometimes I heard the pitters and patters of raindrops. Sometimes I didn't. It was up to 34 F when I woke, so at least it isn't down into freezing as it rains. I brought the trash barrel back from the curb, to get a better feel. Well, 34 and wet. Go figure. But sometimes that feels colder or warmer? Today it... felt... just like it shoul.
The legs are doing better. I went without compression last night. My legs needed a bit of a break, got it. Must have had a massive bloody nose last night. Couldn't wake, and don't remember it. But, too, didn't drain all out. I must have rolled onto my back, subconsciously or semiconsciously... but forgotten if every somewhat know. Thankfully, as no mess to contend with this morning.
Just a bit rusty, as mentioned. Legs are still tight, still a bit tired, but certainly have had worse even just in the last days. Much worse. Doing well, with all the givens. The cold isn't helping. Even at just above freezing, it is rather cold. And that is getting to me.
Sassy has been fed, a load of laundry is getting a finishing touch in the dryer, then I'll put the last load into the dryer. Hopefully a shower before too long. As well, a start on dishes, and the freezertop. Bit by bit, it is hoped. No guarantees, just some probables and maybes.
I have been looking at a few things. While considering redoing the bath, after getting the septic tank flushed and checked, which will have to wait until snow is gone and I can find the tank? Right. But, after that, I would like to paint or otherwise work on the tub to get it clean, leveled, and regrout the lip of the front of the tub. The rest of the grouting is good. As well, I would like to consider replacing the parts and bits of the drain system, and get a new... push stopper... in. Clean up or replace the other parts while at it.
So, I have been looking. And, more. I am considering installign a vent fan, heater, and light unit in the shower. There is a window right there. But that is impossible to use in the winter. Somewhat of a trick, as snow likes to build up right above the shower. And along that whole section of the roof. Though, with a bit of a stretch, I could move it over to where it is less of an issue.
I, at first, worried a bit about the electrical. But, then I realized I could just put in new components while simply reusing the old electrical. It won't take all that much, and is rated at 120v and 15 amps. Which... is what the bathroom is wired for. I just just replace the overhead light, basically.
There would be some learning. But I want to learn anyway. I really want to get a stove fan installed as well. That requires installing a three-way socket, which shouldn't be difficult with wiring from something else up there, probably right off the overhead lighting in the kitchen, or some such.
Anyway, I am looking at pieces, parts, and pricing. Just using amazon as a plasterboard. Will probably buy locally, and talk to folks while I am gearing and parting up. Somethings I could go with amazon, such as metal crimpers, perhaps insulated flexible ducting, and foil tape, and such. Things I would be much less likely to need to return. That can be such a pain.
No hurry. And it won't be doable until the snow is gone and the world warms just a bit... if too before it gets to hot if I plan on doing that this year. The nice thing about installing the fan in the bathroom is that would set me up for installing a vent hood in the kitchen. Slightly different, but not impossibly out of the range.
Or... I am just dreaming. But, yes, I would like to do that. If I do that, I might also get one installed in the other bathroom? Maybe. It would, pretty much, be the same thing. Only snow doesn't build up as high on that slope of the roof, facing south as that one would.
Dreaming little dreams. But, gee, these things are expensive. Not grandly, but... hundreds of dollars, several to double that. The work itself, mostly, isn't all that difficult. It's the parts, doing it correctly, and the work. Working through a steel roof is a bit... more work than shingles. If there are more advantages, otherwise, for steel roofs. Including sealing back much better... if done correctly. But the work is quite a bit more difficult.
Well, and I keep finding other projects... like fixing up the garage door. I never did get an electric lift on it. Might consider that, before too long. Dunno. Money, of course, is always an issue. But, there are a lot of tasks I might be able to hit. Actually, I already have hit... three or four in the last few weeks... months. Oh, and I would like to redo the sink drains, put in pop-ups in those as well, with screens which can be emptied. Yes. Bit by bit. Thoughts. Ideas... all dependent on money. Later.