.
.
I had two pieces cut, but one of them was... off. For the shelving, done yesterday. None of my tools seemed to be working for a third cut of the material yesterday. With the blades I bought yesterday, and yet a great deal of effort, I got the final cut this morning. Most metal is soft, this was not. It must have been hardened. I remind, I tried the angle grinder on it yesterday... before seeing the folly in that... and only nicked it. The grinder hadn't even cut clean through. I used a blade in the sawsall that is supposed to be for harder metal. It was a beast even so, I think the blade is a ruin as well. But, done. Then I arranged those pieces on the wall, got one drilled in, which was a beast as well. It's like they used iron wood in there. I ended up having to drill a smaller starter hole, then a larger one. Even then the screws were a beast to get in. Never mind. The shelving is up. Now I simply have to figure out how to dismantle the floor shelving structure, poor as it is, and either unbolt or saw off the parts I need. Well... then figure out how to attach those to the shelving mounts.
Still, I got so much more done already today than what I accomplished on the whole of yesterday, and before waking, or even breakfast! I did get a few sips of coffee in while working. That helps. Hmm, breakfast, then some more work, then out for a hike. Same path. Not sure I expect as much today, but I'll do the same as before, the same as I will be doing from now on... one foot in front of the other, and so on, until I have gone a bit past my reserves, and then some more, and some more, until there is no more... then return. And as at much of a pace as I can maintain. I hope to make it as far as Monday, and more. I just don't know. Then again, I hear no thunder. It is cloudy, it might well rain. Those things I can handle. Having bones shaken by thunder not a thousand, more like 600, yards above... sort of changes plans.
No, I did not lift last night. If I want to try to keep up, I'll have to do that tonight. Not sure I can keep up with the plans, but will aim for that. Much of what I am doing in the cave is physical. While drilling, keeping parts level, and... all that... doesn't seem physical, trying to get a 6'5" guy into a 4' by 2' area, bent and twisted, while using heavy drills, keeping balance, and having almost no wiggle room or space to even adjust the feet, or trying to check a level that is jerryrigged to start and precariously so, over and over, is a workout. I think the hard part is finished. If I have to do any cutting, I will grab the grinder, go outside, and have at it with absolute abandon. I'm tired of negotiating. If need be, and I destroy things, I'll just figure something else out. Damned crap anyway!
Hmm... after breakfast and a short break, I'll begin extricating the shelving. If that goes smoothly, and I can figure out a mounting process, I'll then head for a hike, and perhaps any additional hardware I may need. Always more, isn't there? Always. Thankfully, I planned on heading to town anyway. I'm on it, Chief. Wait! I AM Chief. Chief, brave, cook, cleaner, camp drunk, you name it. A veritable one man disaster. Yum! Yeah, well, whatever. I'm on it. Later.
No comments:
Post a Comment
Backsass Here